Skip to product information
1 of 17

Jonine's Corner

Vesgantti 12 Inch Innerspring Multilayer Hybrid Mattress with Memory Foam and Pocket Spring Mattress Medium Firm Feel

Regular price
$3,422.40
Regular price
$5,133.60
Sale price
$3,422.40
Shipping calculated at checkout.
Size
Color Classification
Ships From

SPECIFICATIONS

Brand Name: Vesgantti

CN: Guangdong

General Use: Home Furniture

High-concerned chemical: None

Installation Method: self-contained

Mattress Filling: Memory Foam,Spring

Origin: Mainland China

Thickness: 12"

Type: Bedroom Furniture

【Hybrid Mattress】The luxury multilayer foams and pocket springs support systerm provide all-round support for 7 parts of your body, while also make your body better release pressure, offering a balanced sleep experience for all sleepers.

【Ultra Quiet】The hybrid mattress has built in hundreds of high quality independent pocket springs with excellent shock absorption and resilience, better motion isolation and lower noise, helping you to sleep peacefully.

【Breathable and Healthy】Designed with comfortable and breathable multi-layer foams, our mattress provides good air circulation and dissipates sweat or moisture to keep your body comfy and dry when you are asleep.

【Quality Sleep】The hybrid mattress offers a medium firm feel and meets most people's sleep preferences, not too hard not too soft. You can enjoy a comfortable sleep every night by using our mattress.

【Mattress in a Box】We make it easy to transport the mattress, the mattresses are compressed, rolled and shipped in a box. Note: Please wait 48-72 (or more) hours for the mattress to fully unfold before using it.

Shipping information

- No EU import duties.
- Ships within 1-2 business days.
- Ships in our fully recyclable and biodegradable signature boxes.

    Vesgantti 12 Inch Innerspring Multilayer Hybrid Mattress with Memory Foam and Pocket Spring Mattress Medium Firm Feel
    Vesgantti 12 Inch Innerspring Multilayer Hybrid Mattress with Memory Foam and Pocket Spring Mattress Medium Firm Feel
    Vesgantti 12 Inch Innerspring Multilayer Hybrid Mattress with Memory Foam and Pocket Spring Mattress Medium Firm Feel
    Vesgantti 12 Inch Innerspring Multilayer Hybrid Mattress with Memory Foam and Pocket Spring Mattress Medium Firm Feel
    Vesgantti 12 Inch Innerspring Multilayer Hybrid Mattress with Memory Foam and Pocket Spring Mattress Medium Firm Feel
    Vesgantti 12 Inch Innerspring Multilayer Hybrid Mattress with Memory Foam and Pocket Spring Mattress Medium Firm Feel
    Vesgantti 12 Inch Innerspring Multilayer Hybrid Mattress with Memory Foam and Pocket Spring Mattress Medium Firm Feel
    Vesgantti 12 Inch Innerspring Multilayer Hybrid Mattress with Memory Foam and Pocket Spring Mattress Medium Firm Feel
    Vesgantti 12 Inch Innerspring Multilayer Hybrid Mattress with Memory Foam and Pocket Spring Mattress Medium Firm Feel
    Vesgantti 12 Inch Innerspring Multilayer Hybrid Mattress with Memory Foam and Pocket Spring Mattress Medium Firm Feel
    Vesgantti 12 Inch Innerspring Multilayer Hybrid Mattress with Memory Foam and Pocket Spring Mattress Medium Firm Feel
    Vesgantti 12 Inch Innerspring Multilayer Hybrid Mattress with Memory Foam and Pocket Spring Mattress Medium Firm Feel
    Vesgantti 12 Inch Innerspring Multilayer Hybrid Mattress with Memory Foam and Pocket Spring Mattress Medium Firm Feel
    Vesgantti 12 Inch Innerspring Multilayer Hybrid Mattress with Memory Foam and Pocket Spring Mattress Medium Firm Feel
    Vesgantti 12 Inch Innerspring Multilayer Hybrid Mattress with Memory Foam and Pocket Spring Mattress Medium Firm Feel
    Vesgantti 12 Inch Innerspring Multilayer Hybrid Mattress with Memory Foam and Pocket Spring Mattress Medium Firm Feel
    Vesgantti 12 Inch Innerspring Multilayer Hybrid Mattress with Memory Foam and Pocket Spring Mattress Medium Firm Feel